Posey and Webster Tube Rehabilitation Project

Posey and Webster Tube Rehabilitation Project Seismic Evaluation and Retrofit Design of Immersed Tubes  PROJECT TYPE Seismic Analysis of Immersed Tubes  LOCATION Oakland, CA  OWNER Caltrans The Posey and Webster Street Tubes provide pedestrian...

SR5 Lake Washington Ship Canal Bridge Pushover Analysis

In this paper the results of SC Solutions’ performance-based evaluation of the as-built Unit 10 frame of the SR5 Lake Washington Ship Canal Bridge are presented. This unit is a three-span frame, located between bridge piers 24 and 27 on the north approach to the...

Performance-Based Seismic Design for Bridges

Design criterion and methodologies have been developed and implemented that require bridges to be without significant damage following severe ground shaking. The design philosophy used to obtain these results is often referred to as “Performance Based Design.” These...
error: Content is protected !!