A Study of the Pile-Wharf Deck Connection at the Port of Oakland

This paper presents the results of a detailed study of the batter pile-wharf deck connection at the Port of Oakland under their Wharf and Embankment Strengthening Program (WESP). It provides insight into the failure mechanisms of the designs studied and an evaluation...

SR5 Lake Washington Ship Canal Bridge Pushover Analysis

In this paper the results of SC Solutions’ performance-based evaluation of the as-built Unit 10 frame of the SR5 Lake Washington Ship Canal Bridge are presented. This unit is a three-span frame, located between bridge piers 24 and 27 on the north approach to the...
error: Content is protected !!